Electricity
Underground power cable protection zone (each side)
Poland
No single national setback applies to every plot. Check the municipality, regional code and utility easements before fixing this zone on the plan.
Distances and rules
A buried power cable has a narrow protection strip on each side. Over it, building and earthworks are restricted to keep the cable accessible and undamaged.
Official local check
Confirm the distance with the municipality / competent authority for the plot.
Poland — Ministry guide to local spatial plans (MPZP / WZ)
Important limitation
This is a planning aid, not a legal opinion. Before construction, check the local land-use rules, easements, the network/utility operator’s requirements and neighbour buildings.