Electricity
Underground power cable protection zone (each side) — Poland
Poland
No single national setback applies to every plot. Check the municipality, regional code and utility easements before fixing this zone on the plan.
Distances and rules
A buried power cable has a narrow protection strip on each side. Over it, building and earthworks are restricted to keep the cable accessible and undamaged.
Official local check
Confirm the distance with the municipality / competent authority for the plot.
Poland — Ministry guide to local spatial plans (MPZP / WZ)
Important limitation
This is a planning aid, not a legal opinion. Before construction, check the local land-use rules, easements, the network/utility operator’s requirements and neighbour buildings.