gardmi 🇷🇺 Garden site planner
Well / borehole
Water source

Well placement rules on a plot

Russia · Auxiliary · depends on foundation

Keep away from septic, toilet and compost; site hydrogeology can require larger distances.

Permit and notice

A permanent (capital) building needs a construction notice; a lightweight one does not.

What counts as a capital structure

Placement rules

A drinking-water source should be planned before septic and compost locations are fixed.

Sanitary zone

Sanitary protection distances to wells, drinking water and dwellings.

Well / borehole sanitary zone
To septic / compost / toilet At least 8 m by SP 53; check sanitary protection context SP 53.13330.2019
Sanitary protection May require a larger protection zone for drinking water Local rules

Important limitation

The catalog is a planning aid, not a legal opinion. Before construction, check the land plot category, local land-use and development rules, easements, utility protection zones and neighbour buildings.

Sources

The editor will use the same source-backed passport for short in-canvas hints.