RD 223/2008 gives a formula (≈ conductor swing + 3.2 + U/150, min 5 m); values rounded.
Distances et règles
The protection zone of an overhead power line is measured from the outer conductors on each side and grows with voltage. Inside it, building and many works need the grid operator’s consent.
Up to 1 kV
5 m on each side
Spain — RD 223/2008 (RLAT, ITC-LAT 07)
6–20 kV
5 m on each side
Spain — RD 223/2008 (RLAT, ITC-LAT 07)
35 kV
5 m on each side
Spain — RD 223/2008 (RLAT, ITC-LAT 07)
110 kV
7 m on each side
Spain — RD 223/2008 (RLAT, ITC-LAT 07)
150–220 kV
8 m on each side
Spain — RD 223/2008 (RLAT, ITC-LAT 07)
330–500 kV
10 m on each side
Spain — RD 223/2008 (RLAT, ITC-LAT 07)
Underground cable
1 m on each side
Spain — RD 223/2008 (RLAT, ITC-LAT 07)
Forbidden inside
Building, storage, planting/felling trees, open fire, earthworks and blasting — without the grid operator’s written consent.
Spain — RD 223/2008 (RLAT, ITC-LAT 07)
Allowed
Passage, driving across and mowing grass.
Règles locales
Limitation importante
Ceci est une aide à la planification, pas un avis juridique. Avant toute construction, vérifiez les règles d'urbanisme locales, les servitudes, les exigences du gestionnaire de réseau/services publics et les bâtiments voisins.