Bath & shower
Bathhouse placement rules on a plot
Netherlands · Auxiliary · usually permanent
There is no single national plot-boundary distance for this object. Its location and permit status depend on the municipal environmental plan, national technical rules and, for water or drainage, the water board. Check the exact address in the official portal.
Placement rules
A bathhouse has both outbuilding setbacks and a sanitary distance to the dwelling.
Other conditions
Runoff, shading and other local-code conditions.
Before positioning
Open Rules on the Map and complete the Permit Check for the exact property and activity
Netherlands — Environment and Planning Portal
Important limitation
The catalog is a planning aid, not a legal opinion. Before construction, check the land plot category, local land-use and development rules, easements, utility protection zones and neighbour buildings.
Sources
The editor will use the same source-backed passport for short in-canvas hints.