Electricity
Power line protection zone: how many metres by voltage
Spanien
RD 223/2008 gives a formula (≈ conductor swing + 3.2 + U/150, min 5 m); values rounded.
Abstände und Regeln
The protection zone of an overhead power line is measured from the outer conductors on each side and grows with voltage. Inside it, building and many works need the grid operator’s consent.
Up to 1 kV
5 m on each side
Spain — RD 223/2008 (RLAT, ITC-LAT 07)
6–20 kV
5 m on each side
Spain — RD 223/2008 (RLAT, ITC-LAT 07)
35 kV
5 m on each side
Spain — RD 223/2008 (RLAT, ITC-LAT 07)
110 kV
7 m on each side
Spain — RD 223/2008 (RLAT, ITC-LAT 07)
150–220 kV
8 m on each side
Spain — RD 223/2008 (RLAT, ITC-LAT 07)
330–500 kV
10 m on each side
Spain — RD 223/2008 (RLAT, ITC-LAT 07)
Underground cable
1 m on each side
Spain — RD 223/2008 (RLAT, ITC-LAT 07)
Forbidden inside
Building, storage, planting/felling trees, open fire, earthworks and blasting — without the grid operator’s written consent.
Spain — RD 223/2008 (RLAT, ITC-LAT 07)
Allowed
Passage, driving across and mowing grass.
Lokale Regeln
Wichtige Einschränkung
Dies ist eine Planungshilfe, keine Rechtsberatung. Prüfen Sie vor dem Bau die örtlichen Flächennutzungsregeln, Dienstbarkeiten, die Anforderungen des Netz-/Versorgungsbetreibers sowie benachbarte Gebäude.