Power line protection zone: how many metres by voltage

إسبانيا

RD 223/2008 gives a formula (≈ conductor swing + 3.2 + U/150, min 5 m); values rounded.

المسافات والقواعد

The protection zone of an overhead power line is measured from the outer conductors on each side and grows with voltage. Inside it, building and many works need the grid operator’s consent.

Up to 1 kV 5 m on each side Spain — RD 223/2008 (RLAT, ITC-LAT 07)
6–20 kV 5 m on each side Spain — RD 223/2008 (RLAT, ITC-LAT 07)
150–220 kV 8 m on each side Spain — RD 223/2008 (RLAT, ITC-LAT 07)
330–500 kV 10 m on each side Spain — RD 223/2008 (RLAT, ITC-LAT 07)
Underground cable 1 m on each side Spain — RD 223/2008 (RLAT, ITC-LAT 07)
Forbidden inside Building, storage, planting/felling trees, open fire, earthworks and blasting — without the grid operator’s written consent. Spain — RD 223/2008 (RLAT, ITC-LAT 07)
Allowed Passage, driving across and mowing grass. القواعد المحلية